Powered land for data centers in Germany
Sites of 5–30 MW IT load on land zoned for industrial or commercial use, connected at 20 kV, with a technology-neutral preliminary building permit.

Powered land for data centers in Germany
Sites of 5–30 MW IT load on land zoned for industrial or commercial use, connected at 20 kV, with a technology-neutral preliminary building permit.

Powered land for data centers in Germany
Sites of 5–30 MW IT load on land zoned for industrial or commercial use, connected at 20 kV, with a technology-neutral preliminary building permit.
What we develop
We develop mid-sized data center sites of 5–30 MW IT load in Germany.
We can combine several projects to meet the size a partner needs.
We secure the land and the grid connection and obtain a technology-neutral preliminary building permit.
We then continue developing the site to ready-to-build, on the partner’s specifications.
Our first sites are in development.
What we develop
We develop mid-sized data center sites of 5–30 MW IT load in Germany.
We can combine several projects to meet the size a partner needs.
We secure the land and the grid connection and obtain a technology-neutral preliminary building permit.
We then continue developing the site to ready-to-build, on the partner’s specifications.
Our first sites are in development.
What we develop
We develop mid-sized data center sites of 5–30 MW IT load in Germany.
We can combine several projects to meet the size a partner needs.
We secure the land and the grid connection and obtain a technology-neutral preliminary building permit.
We then continue developing the site to ready-to-build, on the partner’s specifications.
Our first sites are in development.
Site profile
IT load
5–30 MW per site (power used by the servers)
Grid connection
20 kV (medium voltage)
Fiber
Fiber optic connection, checked for every site before we commit
Land
Zoned for industrial or commercial use
Location
Germany
Stage
First sites in development
Starting point
Powered land with a technology-neutral preliminary building permit
Site profile
IT load
5–30 MW per site (power used by the servers)
Grid connection
20 kV (medium voltage)
Fiber
Fiber optic connection, checked for every site before we commit
Land
Zoned for industrial or commercial use
Location
Germany
Stage
First sites in development
Starting point
Powered land with a technology-neutral preliminary building permit
Site profile
IT load
5–30 MW per site (power used by the servers)
Grid connection
20 kV (medium voltage)
Fiber
Fiber optic connection, checked for every site before we commit
Land
Zoned for industrial or commercial use
Location
Germany
Stage
First sites in development
Starting point
Powered land with a technology-neutral preliminary building permit
What you buy
Powered land
Powered land means the site and its grid connection are secured. It comes with a technology-neutral preliminary building permit: the authority's answer that a data center is allowed on the site in principle. The design is not fixed.
Then: ready-to-build, on your specifications
We continue developing the site through the full building permit to ready-to-build, using your technical specifications and your chosen technology. Ready-to-build means permits and grid connection are in place and construction can start.
What you buy
Powered land
Powered land means the site and its grid connection are secured. It comes with a technology-neutral preliminary building permit: the authority's answer that a data center is allowed on the site in principle. The design is not fixed.
Then: ready-to-build, on your specifications
We continue developing the site through the full building permit to ready-to-build, using your technical specifications and your chosen technology. Ready-to-build means permits and grid connection are in place and construction can start.
What you buy
Powered land
Powered land means the site and its grid connection are secured. It comes with a technology-neutral preliminary building permit: the authority's answer that a data center is allowed on the site in principle. The design is not fixed.
Then: ready-to-build, on your specifications
We continue developing the site through the full building permit to ready-to-build, using your technical specifications and your chosen technology. Ready-to-build means permits and grid connection are in place and construction can start.
How we work
Secure the site
Grid connection (20 kV)
Technology-neutral preliminary building permit
Powered land
Full building permit to ready-to-build, on the partner's specifications
How we work
Secure the site
Grid connection (20 kV)
Technology-neutral preliminary building permit
Powered land
Full building permit to ready-to-build, on the partner's specifications
How we work
Secure the site
Grid connection (20 kV)
Technology-neutral preliminary building permit
Powered land
Full building permit to ready-to-build, on the partner's specifications
Who this is for
Read the data center section for your role
what a data center brings to your town.
Who this is for
Read the data center section for your role
what a data center brings to your town.
Who this is for
Read the data center section for your role
what a data center brings to your town.
Contact
Talk to us about a data center site
Send us your site requirements: IT load, preferred region and timeline.
Contact
Talk to us about a data center site